requestId:686148ce231441.79857135.
Hu Jianping Zhejiang Jinhua Electric Bureau
Recently, Zhejiang has once again ushered in a “touching” moment. The “Zhejiang Acclaim–What to Do Next?” Influencer Character Review” event was officially launched by Zhejiang Guangyi Group in cooperation with more than 30 media outlets from both inside and outside the province. Wang Jianqin was the first person to enter Zhejiang’s power industry.Manila escort, a 50-year-old student from a technical school, was one of the first to enter Zhejiang.Manila escort.
Wang Jianqin, who was born in a technical school, was a Manila escort.Manila escort in his 50s. href=”https://philippines-sugar.net/”>Sugar daddy is a senior technician of military-style, agricultural and virgin police, and has been fighting for 33 years in the railway line inspection and operation and power-treatment work positions. Since joining the task in September 1976, he has been a popular worker, embracing the emotions of ordinary people, and doing high-pressure railway line protection tasks that seem popular but are indispensable to society.
Iron Lucky The game is a cliff
Since mid-January 2008, a snow and ice that has entered the history of severe climate disasters in Zhejiang hit Jinhua.comSugar baby, forming a total of 58 500 kV iron towers, a 500 kV contact line between Zhejiang and Fujian, all the interruptions of the 500 kV power channel between Jinhua and Quzhou, Taizhou, Wenzhou and other places, and 14 items from Jinhua.com 9 lines of the 00 kV line were cut off. Jinhua Electric Network is in danger! Zhejiang Electric Network is in danger! Seven front-line commands operate simultaneously, 10 teams from four provinces and three cities work together to repair, 19 sites, nearly 100 construction sites were hit, and 25,000 troops were involved in the battle… “Fighting Zhejiang and Deciding on Golden Hua”, a main power behind the scale of the gameSugar Baby‘s online repair and attack battle was launched in Jinhua. In less than a week, Wang Jianqin worked extremely strongly, led the industrial district employees, and conducted a special tour of the 58-based inverted towers in the first time from the 10,438 foundation tower. From the ground line of more than 3,500 kilometers , the precise locations of all the breaking lines were found at the first time.
At 4:00 am on January 28, Wang Jianqin took the Jinhua Electric Bureau to send a 35-person rushing team from the Electrical Engineering District to Niuta Mountain in Wuyi to repair the dual-sui line that supplies electricity from Jinhua to Suichang. After 2Pinay escortAfter a few hours of rushing and 4 hours of digging through the mountain, I finally found the top cliff at the main peak of Niuta MountainThe problem at the same time. At the corner of the cliff with an oblique angle of 70 degrees and a surface of less than 3 square meters, at the entrance of the cliff with a temperature of less than 3 meters, a temperature as low as minus 5 degrees, and a wind force of nearly 6, Wang Jianqin braved his life to slide down the cliff at any time, and at any time from high pressure line damage and other life threats, he fell to the line fault point. A double-line repair that can be broken down at any time when climbing up the cliff entrance,” in a test of life and death, facing the bright and warm vision of the whole city of Suichang, Wang Jianqin and his team members chose to PK with time, PK with cliff, PK with physical energy, and PK with themselves. Because he believed that in this competition where social responsibility was carried out in various industries, the champions would always run before the palm of their hands. From 6:30 am to LIU RECOVERY to RECOVERY RECOVERY ON LIVE IN LIFE TO RECOVERY IN THE LIFE OF LIFE, Wang Jianqin and others had spent a full 12 hours in the snowy and ice of Niuta Mountain. The book describes a popular line worker who is extremely proud of his high quality and fears his survival.
Four hoursPinay escortEight chapters The flat ground iron tower
On the New Year of 1999, Wang Jianqin, who was just surrounding the group table and preparing to eat the group food, received an emergency repair call. A 220 kV line connecting Jinhua and Yiu found the emergency shortcomings. In the eyes of his wife Dai Suying, Wang Jianqin had already been doing the iron towers and rods on the mountain. After getting used to the habit of going out early and going to bed late, he had already mixed up the concept of mission and rest. He had not been able to stay at home for a few days from the beginning of the year. “It seems that the cold iron tower is his wife. Every time he goes home, the heroine Wan Yurou is the only young actress in Jiafeng. She even complains about back pain when she gets a crying call, but when she gets the call, his energy comes back.”
During the 2008 ice disaster, Wang Jianqin became one of the busiest people in the snowy ice in Niutao Mountain in Wuyi, Pan’an Qingmeili, and Yiwu Lengjian. At the earliest time, every day, we can arrange emergency patrol repair tasks at 3 o’clock in the morning. At the latest, we can eat the so-called “hot meals” with our team members. At the most, we have to drain three mobile_phone batteries a day. At the busiest time, we have to take hundreds of phone calls to contact the tasks a day. At the most tired time, we have to climb more than 6 hours of mountain roads a day, do four flat roads a day, and then go through two hours. escortThe cliff repairs, and at the end, you have to participate in a meeting of more than an hour. At the most difficult time, you have to set up several ten small patrol teams a day. When you are most uneasy, you have to receive dozens of bad news reports a day. At the most embarrassing time, you will face the task of setting up the shift team repair, edit the latest patrol results, and coordinate the adjustment.Repair resources, participating in emergency emergency meetings, point repair plans, and implementing safety measures. The most inconsistent time is to want employees to rest on the one hand, and to continue repairing on the other hand.
Six and three tips, Intelligent Line Iron Army
The disaster of ice and snow in 2008 caused the 110-500 kV transmission lines of Jinhua Network to continue to cause ice flashes, slams, and towers, which were severely affected, which formed a serious threat to the safe and stable operation of Jinhua and Zhejiang Network. As a Communist Party member and leader in the industrial area, he set an example and led the way in this battle to fight against ice and disaster and ensure electricity supply, and paid his own strength in this battle to fight against ice and disaster and electricity supply.
First, point forward and move quickly to ensure that you can grasp the disaster situation at the first time and provide first-hand information for anti-disaster disaster. Faced with the sudden disaster, as the chief of the industrial district director to fight disaster, he can be busy but not troublesome, and quickly start the emergency rescue mechanism to ensure that all tasks are carried out in an orderly manner. In order to grasp the disaster in time, since January 16, the daily mission time has reached 13 to 14 hours without a day of rest. At the same time, the mechanism perfect emergency guarantee was perfected, and the early-stage meeting system was prepared, and the relevant meeting energy of the Internet, Huadong, provincial companies and bureaus was conveyed in time. The task and technical briefing of the day were assigned.
The second is to set an example and Sugar daddy leads the way, ensuring that they fight against disaster relief in the first time, and fight for safe operation in seconds. Being in a simple and meticulous way in your mission, using the code to do the most important task in your mission time. Auspiciously participate in Anjian 1699 line 6#~10Sugar baby# file breaking repair and 10 base line distortion main material replacement, stream line 4397 line 34#~41# 3600 meters of the ground line resistance sectionSugar daddy replacement, repair of Fangdu 2Q23 line 22#~23# breaking ground, repair of Guandu 2Q24 line 27# left ground line distorted, and repair tasks such as double-sex 2389 line 17 material guide line processing, etc., enjoy the joy and fight with the working area staff. After the 19-20 line of Shayuan Line 1649 was repaired, Wang Jianqin proposed a new plan and then opened the power 13 days earlier than the original plan.
The third is to coordinate and do your best to organize the Jinhua Internet homepage to investigate the war. She remembered that there was a nearby company.At the property rescue station, he turned around and worked in the club with his cat in his arms. According to the request of the provincial and bureau departments, in order to ensure the smooth progress of the main network’s repair and attack, we actively strengthen our contact and cooperation with each repair construction unit, and conduct the battle step by step in time. We adhere to the principle of no connection between construction and acceptance, so as to ensure that the repair lines are reliable.
Ten spears and one sheath to temper four “special” quality
First, you can enjoy the TC:
發佈留言